Transit and Tunnel Power – Battery and Hybrid Generators

Hybrid Power Solutions builds battery and hybrid generators for transit, rail and tunnel work: zero exhaust underground, silent for night shifts, and rated to −30 °C. Power track crews, tunnel site trailers, pumps and large loads without running a diesel generator in an enclosed space.

Why battery power for transit and tunnel work

  • No exhaust in the tunnel. Battery power produces no fumes, so crews are not working next to a running engine.
  • Silent night work. Track and station work often happens overnight near homes. Battery generators run without engine noise.
  • Less fuel to handle. No refuelling on the track or underground, and fewer fuel cans to store and move.
  • Works through winter. Our Batt Packs, Spark Cube and TERRA are rated to operate down to −30 °C.

Which system fits your crew

Batt Pack battery generators 3 kW to 7 kW continuous, 2.5 kWh to 10 kWh. Portable power for track and tunnel crews: tools, lighting, signal and inspection equipment. Recharge from the grid, a vehicle or solar.
Spark Cube 12–24 kW continuous, 48 kW peak, 20–60 kWh. 208 V three-phase or 120/240 V split-phase. For tunnel site trailers, dewatering pumps, ventilation, lighting and tool cribs. Available trailer-mounted, with an optional diesel generator that starts only to recharge the battery.
TERRA 166 kVA, 180 kWh, 480 V three-phase (3W+N), or 600 V with a 480 V to 600 V transformer. For large loads such as hoists, shaft equipment and whole-site power. Available trailer-mounted.

Tell us your loads, supply voltage, working hours and where the equipment will sit. We will confirm the system size, the charging plan and whether a generator is needed at all.

Lead times

Batt Packs and Spark Cube are typically 8–12 weeks from order. TERRA is typically 16–22 weeks.

Buy, rent or lease

Buy outright, rent through our rental partners, or lease directly from HPS. See generator rental and leasing.

Frequently asked questions

Can a battery generator be used inside a tunnel?

Battery power produces no exhaust at the point of use, which is why it suits tunnels and enclosed work areas. Follow your site's ventilation and safety rules for all equipment.

How long will it run on a night shift?

Runtime is the battery's energy (kWh) divided by the average load (kW). Send us your load list and shift length and we will size the system.

How is it recharged?

From the grid between shifts, from a vehicle or solar for Batt Packs, or from an optional diesel generator on the Spark Cube that runs only to recharge the battery.

Do they work in winter?

Yes. Batt Packs, Spark Cube and TERRA are rated to operate down to −30 °C. See our cold weather battery guide.

What is the lead time?

Batt Packs and Spark Cube are typically 8–12 weeks from order. TERRA is typically 16–22 weeks.

Get a transit or tunnel power quote